VCPUSD Bond Measure SS
Valley Center-Pauma Unified School District is dedicated to inspiring our students to explore limitless possibilities for their future. To realize this potential, our students, staff, and community must have school facilities that cultivate learning and provide a safe environment for all to succeed. With an average age of 44 years, our school sites, while historical, beautiful, and well-maintained, need upgrades and renovations. Along with site maintenance and repair, removing aging portable classrooms, and improving safety and school security, the District plans to expand Career and Technical Education (CTE) facilities, update libraries and classrooms, and provide new, up-to-date learning spaces to prepare our students to be successful in school and beyond.
The VCPUSD Board of Trustees approved a bond measure resolution on May 9, 2024, to be included on the November 5, 2024 general election ballot. If local voters approve Measure SS, these funds cannot be taken from our community or repurposed for other use. The measure would provide the bond proceeds necessary to renovate and modernize the local schools that our community’s children attend.
General Obligation (GO) Bond Information
Local ballot measure
55% approval rate required
Independent Oversight Committee required
No proceeds to salaries
Funds received after bond sale(s)
Only projects included in the bond measure
VCPUSD History of Facilities Management
Last bond issued 32 years ago
Repairs to multiple roofs
Replacement and repairs to HVAC systems
Flooring replacements
Repairing of asphalt surfaces
Replacement of playground equipment
Child nutrition freezer and fridge replacements
Interior and exterior painting
Lighting upgrades at all sites
Potential Projects
Primary
TK-K wing with 11 classrooms
Increase security
Update septic system
HVAC systems
Parking lot repairs
Elementary
6th grade wing with central kitchen and MPR
Remodel central area into 6 classrooms
Increase security
Update septic system
Parking lot repairs
Lilac
Increase security
Update septic system
Replace HVAC systems
Upgrade security cameras
Eaves replacements and stucco repair
Pauma
Renovate historical admin building
TK classrooms
Increase security
Update septic system
Parking lot repairs
Middle School
Create CTE classrooms and modernize labs
Modernize library/media center
Gym floor renovation
Increase security
Parking lot repairs
High School
Modernize labs
Modernize library/media center
Track replacement and stadium lighting
Increase security
Parking lot repairs
Oak Glen and VC Prep
Increase security
HVAC systems
Upgrade security cameras
Update intercoms and phone systems
Upgrade network equipment
All sites
Upgrade network equipment and infrastructure
Update playing fields and equipment
Update septic systems
Update intercoms and phone systems
Replace deficient fixtures, equipment and furniture